hitting the plans again in hopes of finishing the structural estimate by tonight. and i'm just starting now. yes i know it's five thirty. i know it's late, but i put in a productive day at home cleaning so i trekked to campus later than i normally do. but i still have hopes. the lab is open until midnight, and i hope that i will take advantage of that. i wanted to do the same yesterday but the energy didn't stick with me. today i brought along lots of snacks, and i intend to eat them all before i leave. and if i stay til pretty late i've given myself permission to order a pizza. which is currently my treat of choice.

but back to the estimate. i have a hefty list of things that need to be accomplished. including: the foundation walls, a concrete topping to the air disbursement system, all of the masonry walls on the first floor, the joists for the low roof and the high roof (yes there are two roofs), the second floor's decking and concrete, the low and high roofing, the support for the chiller, and any louvers included in the building (i think there's a few). so i have a lot to accomplish in six and a half hours. woo me! let's hope i can rock it!

No comments:

Post a Comment